Rule for XmR chart

What is the process for obtaining an XmR chart? What is the rule to create a XmR chart ?

Hi @nivethitha.ponnambal , In order to create an XMR chart, the following conditions must be met:

  1. The chart must include 3 metrics and 1 dimension.
  2. The upper bound value should be greater than the lower bound value.
  3. The plotting value can be in either direction.
  4. The color set for the chart should be chosen to represent the plotting within the lower bound in one color and within the upper bound in another color.
  5. The metrics type should be either quantity or currency.
4 Likes